Byers Industrial Services

Mechanical Estimator - Data Center Construction

Byers Industrial Services

 Abilene, TX

Mechanical Estimator – Data Center & Mission-Critical Construction

Company: Byers Industrial Services
Location: Remote / Hybrid – United States
Employment Type: Full-Time
Salary: $100,000+ Annually DOE
Travel: Occasional Travel for Project Site Walks, Pre-Bid Meetings, and Field Evaluations

About Byers Industrial Services

Byers Industrial Services is a growing industrial electrical and mechanical contractor specializing in large-scale construction projects throughout the United States. Our operations support data centers, manufacturing facilities, industrial infrastructure, distribution centers, substations, and other mission-critical environments.

As we continue expanding our presence in the data center construction industry, including upcoming project opportunities in Texas and Indiana, we are seeking an experienced Mechanical Estimator with extensive knowledge of mission-critical mechanical infrastructure, industrial piping, HVAC systems, and complex mechanical construction.

This position offers the flexibility of a remote or hybrid work arrangement, with occasional travel to project locations as required.

Position Overview

The Mechanical Estimator will be responsible for preparing accurate, competitive, and comprehensive mechanical estimates for large-scale data center and mission-critical construction projects.

Candidates must possess a minimum of five (5) years of direct mechanical estimating experience specifically within data center construction. This is a mandatory requirement.

Priority will be given to candidates with demonstrated estimating experience involving large-scale chilled water and condenser water piping systems, central utility plants, cooling equipment installation, and mechanical commissioning.

The successful candidate must understand the mechanical construction process, including central cooling plants, hydronic distribution, industrial process piping, precision cooling equipment, mechanical controls, and final commissioning.

This individual will work closely with executive leadership, project management, procurement, and field operations to evaluate project opportunities, develop detailed cost estimates, prepare competitive bids, and support the continued growth of Byers Industrial Services' mission-critical construction portfolio.

Key Responsibilities

Mechanical Estimating & Preconstruction

  • Develop comprehensive mechanical estimates for hyperscale, colocation, enterprise, and mission-critical data center construction projects.
  • Review mechanical drawings, piping and instrumentation diagrams (P&IDs), equipment schedules, specifications, bid packages, and construction documentation.
  • Perform detailed material quantity takeoffs for mechanical equipment, piping systems, fittings, valves, ductwork, insulation, and associated infrastructure.
  • Prepare labor estimates based on installation methods, manpower requirements, fabrication needs, productivity expectations, project schedules, and construction conditions.
  • Develop complete cost breakdowns covering labor, materials, equipment, subcontractors, rentals, fabrication, rigging, and project-related expenses.
  • Prepare preliminary project budgets, cost projections, and competitive bid proposals.
  • Evaluate RFIs, bid addenda, scope clarifications, subcontractor proposals, and contractual requirements.
  • Identify scope gaps, constructability concerns, project risks, and opportunities for cost savings.
  • Support value engineering, design-assist activities, and alternative installation methods.
  • Assist with change order pricing, budget development, and project cost evaluations.
  • Maintain accurate estimating documentation, historical pricing, and bid records.

Project Cost Management, Scheduling & Constructability

  • Evaluate long-lead mechanical equipment, including chillers, cooling towers, pumps, heat exchangers, CRAH units, and Cooling Distribution Units.
  • Account for procurement lead times and potential impacts on construction schedules.
  • Evaluate piping fabrication requirements, welding procedures, material specifications, and installation methods.
  • Develop labor estimates based on pipe size, material type, joining methods, equipment installation, and field conditions.
  • Evaluate manpower availability, overtime requirements, and project-specific labor productivity.
  • Identify cost impacts associated with equipment rigging, crane operations, mechanical room congestion, and installation sequencing.
  • Account for testing, flushing, chemical treatment, commissioning, QA/QC documentation, and final turnover requirements within project estimates.
  • Evaluate prefabrication and modular construction opportunities to improve installation efficiency.
  • Identify financial risks associated with incomplete designs, scope gaps, changing project requirements, and material price fluctuations.

Project Coordination, Contracts & Bid Management

  • Collaborate with project managers, construction management, superintendents, procurement personnel, and executive leadership throughout the estimating and bidding process.
  • Communicate estimate details, pricing assumptions, scope clarifications, and project requirements to internal teams and clients.
  • Obtain and evaluate vendor, supplier, manufacturer, and subcontractor quotations.
  • Review construction contracts, bid specifications, and scope exclusions to identify financial and operational risks.
  • Assist with bid negotiations, pricing discussions, and contract-related scope clarifications.
  • Participate in bid reviews, preconstruction planning meetings, and project handoffs following contract award.
  • Coordinate with field leadership to ensure estimates accurately reflect construction conditions and installation requirements.

Travel & Project Site Evaluations

  • Participate in occasional project site walks, pre-bid meetings, and field evaluations.
  • Travel to active or prospective project locations as necessary to evaluate site conditions and construction requirements.
  • Support upcoming data center opportunities in Texas, Indiana, and other locations throughout the United States.
  • Coordinate with project management and field operations to identify logistical challenges, labor considerations, and project-specific estimating requirements.

This is primarily a remote or hybrid opportunity and is not intended to be a full-time traveling position. However, flexibility for occasional business-related travel is required.

Required Qualifications

  • Minimum five (5) years of direct mechanical estimating experience specifically within data center construction. This requirement is mandatory.
  • Proven experience preparing mechanical estimates for large-scale data center and mission-critical construction projects.
  • Strong technical understanding of industrial mechanical construction, HVAC systems, process piping, and hydronic distribution.
  • Experience developing complete mechanical estimates, including material takeoffs, labor projections, equipment costs, subcontractor pricing, fabrication, and project budgets.
  • Ability to interpret mechanical drawings, P&IDs, equipment schedules, specifications, and construction documents.
  • Knowledge of mechanical construction methods, piping fabrication, welding, labor productivity, installation sequencing, and project scheduling.
  • Familiarity with applicable mechanical codes, ASME piping standards, and construction requirements.
  • Proficiency in Microsoft Office, particularly Excel, and experience with construction management or mechanical estimating software.
  • Strong understanding of cost management, cost control, contract requirements, and construction budgeting.
  • Strong communication, organizational, analytical, and problem-solving skills.
  • Ability to independently manage multiple bids and meet demanding submission deadlines.
  • Willingness to travel occasionally for project site walks, pre-bid meetings, and other estimating-related activities.

Priority Experience & Qualifications

Candidates with demonstrated estimating experience in the following areas will receive priority consideration:

  • Chilled Water & Condenser Water Piping: Large-diameter piping systems, hydronic distribution, pipe fabrication, welding, material takeoffs, and installation labor.
  • Central Utility Plants: Chiller plants, cooling towers, pumps, heat exchangers, and large-scale cooling infrastructure.
  • Mechanical Equipment Installation: Rigging, hoisting, setting, connecting, and installing chillers, CRAH units, cooling towers, pumps, and associated equipment.
  • Mechanical Commissioning: Pressure testing, flushing, cleaning, TAB, equipment startup, Level 4/Level 5 commissioning, and final turnover requirements.

Preferred Qualifications

  • Experience estimating hyperscale, colocation, or enterprise data center construction projects.
  • Experience estimating multimillion-dollar mechanical construction packages.
  • Experience estimating direct-to-chip liquid cooling systems, Cooling Distribution Units, and advanced cooling infrastructure for AI data centers.
  • Prior experience with a mechanical contractor specializing in mission-critical or industrial construction.
  • Field experience as a Mechanical Foreman, Pipefitter, Millwright, Mechanical Superintendent, Project Engineer, or Mechanical Project Manager.
  • Proficiency with Procore, Bluebeam, Trimble AutoBid Mechanical, FastPIPE, HeavyBid, or comparable mechanical estimating and project management platforms.
  • Experience with AutoCAD, Revit, Navisworks, and construction document management software.
  • Familiarity with design-build, design-assist, and negotiated construction projects.
  • Understanding of prefabrication, modular mechanical systems, and large-scale equipment installation.
  • Strong knowledge of procurement lead times, labor loading, manpower planning, and mechanical construction cost controls.
  • Experience reviewing construction contracts, subcontractor proposals, and bid negotiations.

What We're Looking For

We are seeking a highly experienced, detail-oriented Mechanical Estimator with a proven track record of estimating complex mechanical packages for data center construction projects.

Our primary focus is identifying an estimator with extensive experience in chilled water and condenser water piping, central utility plants, major cooling equipment installations, and mechanical commissioning.

The ideal candidate understands the relationship between mechanical system design, material quantities, fabrication requirements, labor productivity, construction sequencing, equipment lead times, and overall project profitability.

Experience with advanced liquid cooling technologies, including direct-to-chip cooling, is highly desirable as the data center industry continues expanding into high-density and AI computing environments.

This individual should be comfortable collaborating with project management and executive leadership, evaluating project risks, and contributing to the continued growth of our data center construction operations.

Applicants must have at least five years of direct mechanical data center estimating experience. General commercial or industrial mechanical estimating experience without the required data center background will not meet the minimum qualifications.

Why Join Byers Industrial Services?

Byers Industrial Services continues to expand its industrial electrical and mechanical construction operations across the United States, with a growing focus on data centers and mission-critical infrastructure.

This position offers:

  • $100,000+ annual salary DOE.
  • Remote or hybrid work flexibility.
  • Opportunity to support major data center projects in Texas, Indiana, and additional markets.
  • Direct collaboration with company leadership and project management.
  • Involvement in large-scale mechanical construction bidding and preconstruction activities.
  • Opportunity to contribute to the continued growth of our mission-critical construction division.
  • Long-term career stability and professional growth.

Apply Today

If you have a minimum of five years of direct mechanical estimating experience in data center construction, particularly involving chilled water systems, condenser water piping, central utility plants, and large-scale cooling infrastructure, we encourage you to apply.

Join Byers Industrial Services and play an important role in estimating and securing the next generation of mission-critical mechanical construction projects throughout the United States.

Pay: From $100,000.00 per year

Benefits:

  • 401(k) matching
  • Dental insurance
  • Health insurance
  • Life insurance
  • Vision insurance

Application Question(s):

  • Please give us a description of your Electrical Data Center Estimating experience?

Work Location: Hybrid remote in Abilene, TX 79605

Apply now

Job details

Location
 Abilene, TX
Job category
Mechanical Estimating
Employment type
Full-time
Estimating tools
Excel
Experience level
Senior / Lead
Posted
Nov 6, 2026

Actions

Request removal of this listing